Advanced work packaging (AWP) breaks capital project scope into installable work packages, planned backward from startup. Here's how it works, and how our team and products support it.
Workface planning is the last step in AWP, turning engineered scope into packages a crew can execute.
5 min read · Updated Jul 2026
What the 3D model does in a full AWP procedure, what still works when a project has no usable model, and which controls have to be rebuilt by hand.
4 min read · Updated Oct 2026
What self-hosting AWP software means for project data, how it divides work with the Primavera P6 schedule, and how Power BI reads package data from it.
4 min read · Updated Oct 2026
What AWP software should hold from FEED to turnover, covering the path of construction, EWPs and PWPs, IWPs and the lookahead, testing, and system completion.
4 min read · Updated Oct 2026
How AWP software is set up from FEED, with the structures agreed before engineering packages, data loaded every week, the model link, and full-time leadership.
3 min read · Updated Oct 2026
The eleven AWP package types from CWA to SWP, who owns each one, and the rules AWP software has to hold for parents, one-to-one packages, and the register.
3 min read · Updated Oct 2026
Seven areas to evaluate in AWP software, drawn from what an AWP procedure asks of it, from building IWPs from the model to completing work by system.
3 min read · Updated Oct 2026
The three parts of AWP software cost, which are the license, the setup, and support through execution, and what each one covers on a capital project.
3 min read · Updated Oct 2026
How advanced work packaging applies inside an operating plant, from the existing plant in the model and site-controlled drawings to MOC and turnarounds.
3 min read · Updated Oct 2026
How an owner runs AWP across several EPC contractors with a standard set before contracts are signed, owner roles, one naming convention, data, and audits.
3 min read · Updated Oct 2026
The AWP registers, the matrix and the readiness history sit in the contractor's system and leave when the contract ends. The fix is where the standard lives.
9 min read · Updated Oct 2026
The definition of complete for all eleven AWP package types, fixed in the procedure, plus the one binary rule of credit that measures EWP progress.
5 min read · Updated Oct 2026
How an engineering contractor runs an EWP release plan an owner can audit, with four statuses, one rule of credit, weekly forecasts and a skyline.
5 min read · Updated Oct 2026
Why a short placeholder count eight weeks before an EWP release predicts a late package, who owns the count, and the weekly check that catches it early.
4 min read · Updated Oct 2026
The AWP Matrix is the one controlled list of every work package and its relationships, owned by the owner's AWP lead and issued weekly before systems change.
4 min read · Updated Oct 2026
The items an owner checks in an engineering AWP audit, when the audits happen, and the weekly routine that lets an engineering contractor pass every time.
4 min read · Updated Oct 2026
The five categories of EWP change, the change notice that precedes revised drawings, and the re-transmitted package that keeps every recipient on one set.
4 min read · Updated Oct 2026
What every row of an engineering HOLD register carries, how HOLDs are accepted at the EWP review, and why a HOLD is released by revising the package.
3 min read · Updated Oct 2026
How a Document Allocation Matrix assigns each document to an EWP, VEWP or FEWP when its placeholder is created, with an example and the rule on unassigned ones.
4 min read · Updated Oct 2026
The small set of AWP roles an owner needs from FEED, who reports to whom, the deliverables each lead owns, and where a partner fills the gaps.
4 min read · Updated Oct 2026
Why module fabrication follows the same AWP requirements as site construction, what FEWPs and MWPs are, and the review two weeks before a module ships.
4 min read · Updated Oct 2026
When a project repackages remaining scope into system work packages, what an SWP contains, and why the lookahead and constraint process stay the same.
4 min read · Updated Oct 2026
What model conditioning covers, from attributes per the data requirements and CWP volumes to an EWP-structured tree, tag checks, and vetted vendor models.
3 min read · Updated Oct 2026
Explore the product these articles are about, or book a live demo to see it on your own project.