Primavera P6 is typically where large capital projects hold their Level 3 schedule, which makes it the place where an advanced work packaging program lands as package activities, coding, and dates. These articles cover how package-based scheduling works in P6 and how schedule data connects to the rest of the AWP stack.

Start here

How Does Advanced Work Packaging Change a Primavera P6 Schedule?

What an AWP-compliant Level 3 schedule looks like in P6: packages as activities, the minimum activity coding, the AWP Matrix, and the four tests that tell you whether it is real.

8 min read

Related hubs

See how openAWP works with Primavera P6

openAWP integrates with Primavera P6, so package structure and schedule dates flow through one connected pipeline.