Primavera P6 is typically where large capital projects hold their Level 3 schedule, which makes it the place where an advanced work packaging program lands as package activities, coding, and dates. These articles cover how package-based scheduling works in P6 and how schedule data connects to the rest of the AWP stack.
What self-hosting AWP software means for project data, how it divides work with the Primavera P6 schedule, and how Power BI reads package data from it.
4 min read · Updated Oct 2026
Seven areas to evaluate in AWP software, drawn from what an AWP procedure asks of it, from building IWPs from the model to completing work by system.
3 min read · Updated Oct 2026
Related hubs
openAWP integrates with Primavera P6, so package structure and schedule dates come from one connected source.