Primavera P6 is typically where large capital projects hold their Level 3 schedule, which makes it the place where an advanced work packaging program lands as package activities, coding, and dates. These articles cover how package-based scheduling works in P6 and how schedule data connects to the rest of the AWP stack.
Related hubs
openAWP integrates with Primavera P6, so package structure and schedule dates flow through one connected pipeline.