Materials management on a capital project tracks every component from purchase order to laydown to installation, so each work package starts with its materials on site and verified. This hub covers how AWP projects measure material readiness: PWPs, ROS dates, model-driven MTOs, and the PO line rules that make readiness visible per package.
The Secondary MTO expands an engineered design into every installable item as a digital row, with the fields that let planners and procurement join it.
4 min read · Updated Oct 2026
What a PWP is, how its start, finish and progress are defined, why one purchase order line item supports one CWP, and how readiness is measured against ROS.
4 min read · Updated Oct 2026
One packing list template for every vendor and fabricator, what each shipped item traces to, QR codes to the child level, and what arrives before the truck.
4 min read · Updated Oct 2026
How AWP projects earn progress on each package type, from binary credit on EWPs to weighted PWP phases and closed IWPs, and why the rules stay objective.
3 min read · Updated Oct 2026
openAWP tracks packages and their constraints, and our consultants connect it to the material systems you already run.