Information management (IM) keeps every dataset on a capital project coherent: documents, tags, models, and the relationships between them. Here is the discipline explained, and how our team and products support it.

Start here

Weekly Data Reconciliation Is the AWP Routine Most Projects Skip

Register, EDMS, ISO list, model and schedule disagree every week on most projects. A weekly reconciliation routine with one owner per dataset fixes it.

10 min read · Updated Oct 2026

More in This Hub

What Is Information Management?

A practitioner definition of IM on capital projects, covering the framework, the reference data library, controlled identity, response codes, and the data warehouse that reports it all.

8 min read · Updated Jul 2026

What a Data Requirements Document Covers

What an AWP data requirements document covers, the tag and placeholder lead times that predict package readiness, and why an EWP can be rejected on data alone.

4 min read · Updated Oct 2026

What a Common Data Environment Is on an Industrial Project

The governed set of project systems and the rules that keep them in agreement, with one owner per dataset.

4 min read · Updated Oct 2026

The Engineering and Procurement Data Warehouse in Project Terms

Raw, validated and reporting layers explained by what they hold on a capital project, who reads and writes them, and how the services are sized to the data.

4 min read · Updated Oct 2026

Tag Governance and the Single Tag Register

One Tag Register as the source of truth, what it holds, the weekly reconciliation that keeps every system matched, and the ten week reservation lead time.

4 min read · Updated Oct 2026

One Document, One Drawing, One Sheet

Why every drawing sheet is its own controlled record, how isometrics and erection drawings are registered, and why a document is never renamed after issue.

4 min read · Updated Oct 2026

How Owners Run AWP Across Several EPC Contractors

How an owner runs AWP across several EPC contractors with a standard set before contracts are signed, owner roles, one naming convention, data, and audits.

3 min read · Updated Oct 2026

What the Secondary MTO Is and Why Drawings Do Not Count

The Secondary MTO expands an engineered design into every installable item as a digital row, with the fields that let planners and procurement join it.

4 min read · Updated Oct 2026