What It Takes to Set Up AWP Software on a Project

By AWPBI Support Team · Updated Oct 2026 · 3 min read

Setting up AWP software starts in FEED, before engineering produces its first package. The software is selected there, alongside the AWP strategy, the construction work areas (CWAs), a preliminary path of construction, and the data requirements. After that, the software depends on structures agreed in advance, data loaded on a fixed cadence, and people who know how to run it. How to evaluate AWP software covers the selection itself.

The Structures Agreed Before Engineering Packages

Before engineering develops its first engineering work package (EWP), these are in place:

The software is configured to these structures. Renaming packages or changing the hierarchy after data is loaded means changing every system that references them, and how Primavera P6 carries an AWP program shows why those shared IDs matter.

The Data, Loaded on a Cadence

Engineering loads its packages into the AWP software, including the documents, the material takeoffs with fabricator piece marks, and every form of model, from engineering and structural to vendor, fabricator, and spool files. Conditioned models arrive weekly. Packages change only through the package register, the AWP software is aligned after each register issue, and a monthly review reconciles it with the schedule and the document register.

The Model

Model components link to tags and packages through attributes set in the design model, such as CWA, CWP, and EWP. Model conditioning for AWP covers what those attributes need. A project without a usable model can still start, and AWP without a 3D model covers what changes.

The People

The setup also needs dedicated, full-time AWP and information management leadership from FEED or sanction, with responsibilities set in a RACI. Projects often leave this out. Training runs from the start for everyone who touches the packages, soft crafts and vendors included.

How openAWP Is Set Up

openAWP can start a project from its AWP Standard template, with the tables, tabs, and relationships already set up and nothing in it locked. Tables and fields change without code. Data loads from Excel, Primavera P6, data warehouses, and other connected systems, on a schedule or on demand. An engineer from our team works with you on the setup and is billed hourly, and the software itself has no license fee.

Our AWP consulting team writes the procedures and the package structure the software runs on.

Related Articles

What Is Advanced Work Packaging?

A plain-language definition of AWP, why capital projects use it, and how it changes execution planning.

7 min read · Updated Jul 2026

How Workface Planning Fits Into Advanced Work Packaging

Workface planning is the last step in AWP, turning engineered scope into packages a crew can execute.

5 min read · Updated Jul 2026

Advanced Work Packaging Without a 3D Model

What the 3D model does in a full AWP procedure, what still works when a project has no usable model, and which controls have to be rebuilt by hand.

4 min read · Updated Oct 2026

Self-Hosted AWP Software with P6 and Power BI

What self-hosting AWP software means for project data, how it divides work with the Primavera P6 schedule, and how Power BI reads package data from it.

4 min read · Updated Oct 2026

Which Project Phases AWP Software Should Cover

What AWP software should hold from FEED to turnover, covering the path of construction, EWPs and PWPs, IWPs and the lookahead, testing, and system completion.

4 min read · Updated Oct 2026

How the AWP Package Hierarchy Maps to Software

The eleven AWP package types from CWA to SWP, who owns each one, and the rules AWP software has to hold for parents, one-to-one packages, and the register.

3 min read · Updated Oct 2026

How to Evaluate Advanced Work Packaging Software

Seven areas to evaluate in AWP software, drawn from what an AWP procedure asks of it, from building IWPs from the model to completing work by system.

3 min read · Updated Oct 2026

How Advanced Work Packaging Software Is Priced

The three parts of AWP software cost, which are the license, the setup, and support through execution, and what each one covers on a capital project.

3 min read · Updated Oct 2026

AWP for Brownfield Projects and Turnarounds

How advanced work packaging applies inside an operating plant, from the existing plant in the model and site-controlled drawings to MOC and turnarounds.

3 min read · Updated Oct 2026

How Owners Run AWP Across Several EPC Contractors

How an owner runs AWP across several EPC contractors with a standard set before contracts are signed, owner roles, one naming convention, data, and audits.

3 min read · Updated Oct 2026

The AWP Record Should Outlive the Contract

The AWP registers, the matrix and the readiness history sit in the contractor's system and leave when the contract ends. The fix is where the standard lives.

9 min read · Updated Oct 2026

What Complete Means for Each AWP Package Type

The definition of complete for all eleven AWP package types, fixed in the procedure, plus the one binary rule of credit that measures EWP progress.

5 min read · Updated Oct 2026

An EWP Release Plan the Owner Can Audit

How an engineering contractor runs an EWP release plan an owner can audit, with four statuses, one rule of credit, weekly forecasts and a skyline.

5 min read · Updated Oct 2026

Placeholders Are the Earliest Warning an EWP Will Be Late

Why a short placeholder count eight weeks before an EWP release predicts a late package, who owns the count, and the weekly check that catches it early.

4 min read · Updated Oct 2026

What the AWP Matrix Is and Who May Change It

The AWP Matrix is the one controlled list of every work package and its relationships, owned by the owner's AWP lead and issued weekly before systems change.

4 min read · Updated Oct 2026

What an Owner Checks in an Engineering AWP Audit

The items an owner checks in an engineering AWP audit, when the audits happen, and the weekly routine that lets an engineering contractor pass every time.

4 min read · Updated Oct 2026

How EWP Changes Are Managed After IFC

The five categories of EWP change, the change notice that precedes revised drawings, and the re-transmitted package that keeps every recipient on one set.

4 min read · Updated Oct 2026

What a HOLD Register Must Contain

What every row of an engineering HOLD register carries, how HOLDs are accepted at the EWP review, and why a HOLD is released by revising the package.

3 min read · Updated Oct 2026

What a Document Allocation Matrix Does

How a Document Allocation Matrix assigns each document to an EWP, VEWP or FEWP when its placeholder is created, with an example and the rule on unassigned ones.

4 min read · Updated Oct 2026

The Lean Owner AWP Organization

The small set of AWP roles an owner needs from FEED, who reports to whom, the deliverables each lead owns, and where a partner fills the gaps.

4 min read · Updated Oct 2026

Why the Module Yard Is an Extension of the Site

Why module fabrication follows the same AWP requirements as site construction, what FEWPs and MWPs are, and the review two weeks before a module ships.

4 min read · Updated Oct 2026

When a Project Moves from IWPs to System Work Packages

When a project repackages remaining scope into system work packages, what an SWP contains, and why the lookahead and constraint process stay the same.

4 min read · Updated Oct 2026

What Model Conditioning Is and Why AWP Needs It

What model conditioning covers, from attributes per the data requirements and CWP volumes to an EWP-structured tree, tag checks, and vetted vendor models.

3 min read · Updated Oct 2026