Deliverables Issued by Discipline
Drawings, models, and MTOs issued by discipline or system have to be repackaged into EWPs before construction can plan against them.

EPCs and engineering firms sit at the front of the AWP chain, where each CWP waits on its EWP finishing first. AWPBI helps engineering teams package deliverables by CWP in openAWP, our AWP software, keep EWP status visible against the schedule, and carry design data through to construction planning, with consultants who embed directly in your project org chart.
Drawings, models, and MTOs issued by discipline or system have to be repackaged into EWPs before construction can plan against them.
IFC progress, HOLDs, and MDR-to-schedule misalignment only show up in a hand-built rollup.
The 3D model, the MTO, and the schedule rarely share package identifiers, so construction rebuilds data engineering already owns.
Package hierarchies, naming conventions, and client data requirements change from owner to owner, and every new project starts with rebuilding the package structure to match.
Why openAWP Fits Engineering Consulting
Plan Installation Work Packages Before Mobilization
Break scope into constraint-free installation work packages along the path of construction. Each IWP holds its discipline, CWP, crew, and the 3D components it covers.
Release Only What's Ready
Packages sit on a lookahead Gantt, and one with an open constraint (drawings, materials, scaffolding, or tools) can't be released to the field.
See Current Field Status
Field teams record progress on each tag by milestone. It rolls up to IWPs and CWPs, and 3D status reports and Power BI read the same numbers.
You Own the Platform
openAWP has no license fee and runs on your infrastructure or ours. It molds to your data requirements (there is no hardcoded package structure), and on your infrastructure the software and data stay with you after the engagement.

Book a live demo of openAWP, or talk to our team about embedding data and development support on your next project.