Outage windows don't wait for work that isn't ready.

Generation plants live by the outage calendar: every scope item that reaches the window with an open constraint burns hours the schedule never gets back. AWPBI brings constraint-free work packaging, systems-based turnover tracking, and 3D-linked reporting to outage and brownfield capital work, so readiness is proven before the unit comes offline.

Challenges

Compressed outage windows

Outage scope is planned to the hour, months before the unit comes offline. A package that arrives with a missing material or an unsigned permit consumes schedule the unit cannot earn back online.

Brownfield work on aging assets

Older units rarely match their as-built drawings, so scope discovered mid-execution forces replanning while crews stand by.

Systems completion discipline

Commissioning hands the plant back system by system, not area by area. Construction sequence, test packages, and turnover documentation have to line up, or startup slips.

Reporting that lags the window

Outage progress is reviewed shift by shift against a committed return-to-service date. A rollup compiled overnight is a shift behind before the morning meeting starts.

Why openAWP fits power generation

openAWP

View product openAWP
  • Plan the work before the work starts

    Break scope into constraint-free installation work packages, aligned to path of construction.

  • Release only what's ready

    Work packages don't reach the field until every constraint (materials, access, permits) is cleared.

  • See status without chasing updates

    Field progress rolls up automatically, so project controls always has a current picture.

  • You own the platform

    openAWP deploys on your infrastructure, molds to your data requirements (there is no hardcoded package structure), and the software and data stay with you after the engagement.

openAWP: an IWP report being generated from the selected work packages

Package your next outage.

Book a live demo of openAWP, or talk to our team about piloting work packaging on a single system or work area first.