Compressed outage windows
Outage scope is planned to the hour, months before the unit comes offline. A package that arrives with a missing material or an unsigned permit consumes schedule the unit cannot earn back online.

Generation plants live by the outage calendar: every scope item that reaches the window with an open constraint burns hours the schedule never gets back. AWPBI brings constraint-free work packaging, systems-based turnover tracking, and 3D-linked reporting to outage and brownfield capital work, so readiness is proven before the unit comes offline.
Outage scope is planned to the hour, months before the unit comes offline. A package that arrives with a missing material or an unsigned permit consumes schedule the unit cannot earn back online.
Older units rarely match their as-built drawings, so scope discovered mid-execution forces replanning while crews stand by.
Commissioning hands the plant back system by system, not area by area. Construction sequence, test packages, and turnover documentation have to line up, or startup slips.
Outage progress is reviewed shift by shift against a committed return-to-service date. A rollup compiled overnight is a shift behind before the morning meeting starts.
Why openAWP fits power generation
Plan the work before the work starts
Break scope into constraint-free installation work packages, aligned to path of construction.
Release only what's ready
Work packages don't reach the field until every constraint (materials, access, permits) is cleared.
See status without chasing updates
Field progress rolls up automatically, so project controls always has a current picture.
You own the platform
openAWP deploys on your infrastructure, molds to your data requirements (there is no hardcoded package structure), and the software and data stay with you after the engagement.