Repeated Scope Planned from Scratch Each Time
Clean energy scopes repeat by design. Without a defined package structure, each area gets planned from scratch, and what was learned at one site rarely reaches the next.

Renewables and energy transition projects are built on repetition, with the same scope executed again and again, often across a program of sites. Aggressive schedules and site-to-site variation erode that advantage fast. AWPBI brings constraint-free work packaging in openAWP, our AWP software, and portfolio-level reporting to clean energy builds, so lessons from one site carry into the next.
Clean energy scopes repeat by design. Without a defined package structure, each area gets planned from scratch, and what was learned at one site rarely reaches the next.
Compressed timelines to energization leave little float. A package released with an open constraint puts a crew on standby the same day.
Each site reports progress in its own format, so the program has no single rollup.
Transformers and other long-lead equipment set the pace, and laydown space differs site to site. A shortfall has to surface in the lookahead, while the plan can still shift around it.
Why openAWP Fits Clean Energy
Plan Installation Work Packages Before Mobilization
Break scope into constraint-free installation work packages along the path of construction. Each IWP holds its discipline, CWP, crew, and the 3D components it covers.
Release Only What's Ready
Packages sit on a lookahead Gantt, and one with an open constraint (drawings, materials, scaffolding, or tools) can't be released to the field.
See Current Field Status
Field teams record progress on each tag by milestone. It rolls up to IWPs and CWPs, and 3D status reports and Power BI read the same numbers.
You Own the Platform
openAWP has no license fee and runs on your infrastructure or ours. It molds to your data requirements (there is no hardcoded package structure), and on your infrastructure the software and data stay with you after the engagement.

Book a live demo of openAWP, or talk to our team about setting it up before your next site breaks ground.