Fabrication and Module Progress Tracked Separately
Shop and module-yard progress lives in vendor reports, so a slipping spool or an incomplete module often surfaces only when the site is already counting on it.

Heavy industrial projects depend on spools clearing the shop, modules shipping complete, materials landing before crews mobilize, and multiple contractors following one path of construction. AWPBI brings work packaging in openAWP, our AWP software, and 3D-linked reporting that put every party on the same plan.
Shop and module-yard progress lives in vendor reports, so a slipping spool or an incomplete module often surfaces only when the site is already counting on it.
When receipts, bag-and-tag kits, and requisition status sit in disconnected systems, crews mobilize without confirmed material readiness.
Civil, mechanical, piping, and electrical contractors sharing a CWA without a common execution plan trade clashes, access conflicts, and rework.
Weekly spreadsheet rollups from each contractor arrive too late to protect the lookahead, so a problem is already days old when it shows up.
Why openAWP Fits Industrial Construction
Plan Installation Work Packages Before Mobilization
Break scope into constraint-free installation work packages along the path of construction. Each IWP holds its discipline, CWP, crew, and the 3D components it covers.
Release Only What's Ready
Packages sit on a lookahead Gantt, and one with an open constraint (drawings, materials, scaffolding, or tools) can't be released to the field.
See Current Field Status
Field teams record progress on each tag by milestone. It rolls up to IWPs and CWPs, and 3D status reports and Power BI read the same numbers.
You Own the Platform
openAWP has no license fee and runs on your infrastructure or ours. It molds to your data requirements (there is no hardcoded package structure), and on your infrastructure the software and data stay with you after the engagement.

Book a live demo of openAWP, or talk to our team about AWP on your next project.